background image

Final Checklist

To Be Completed by the Installer

• Check all parts are installed.

• Ensure that all panels and parts thereof are secure and final electrical tests have been conducted in accordance

with local electrical regulations.

• Ensure product is level, securely fastened to the cabinetry and opens and closes freely. The drawers must be

free to fully close with no resistance from the cabinetry.

• Ensure inlet hose to water supply has supplied rubber washer fitted, and that it’s tightened a further half turn

after seal contact.

• Ensure any knockouts or plugs in drain connection have been drilled out and drain connection has been made.

• The drain hose joiner must not support the weight of excess hose material. Keep drain hose as fully extended as

possible to prevent sagging. Any excess length of drain hose should be kept on the dishwasher side of the
highloop.

• If connecting the drain hose to the sink trap, ensure the Highloop is a minimum 5 7/8” (150mm) higher than the

drain hose joiner.

• Ensure any packaging or tape securing the racks is removed from the drawers.

• Water softener models only: adjust the water softener setting from the default setting to suit the water hardness

of the area. See the Quick start guide and section ‘Water softener’ in the User guide.

• Turn on the power and water supplies, then open the drawers. You should hear a beep and see a program

indicator light up on the internal control panel.

• Check the spray arms are in place, mounted correctly and free to rotate, by physically rotating by hand.

https://producthelp.fisherpaykel.com/us/Clean/DishDrawer%E2%84%A2/Integrated_Single/DD24SI9/Installation_Guide_DD2…

Updated: Tue, 16 Nov 2021 11:43:14 GMT

Powered by

1

Reviews: