5 | Operation
FISCHER Mess- und Regeltechnik GmbH
66
BA_EN_DE90
5.5.1.5.5 Colour change C1 delay off
Directory: \Configuration\Channel 1\Colour change C1\Col.ch. C1 delay off
Level: 4
Col.ch. C1 delay off
1
2 3
4
OK Cancel
Edit
0
s
U
Fig. 92:
Colour change C1 delay off
The deactivation delay acts when changing from a higher risk level to a lower
risk level.
This results in the following connection between the delay and the colour
change:
Danger level
Delay
Danger level
Delay
increasing signal
RED
RED
YELLOW
YELLOW
GREEN
2
1
0
1
2
S1
S2
S3
S4
falling signal
RED
RED
YELLOW
YELLOW
GREEN
2
1
0
1
2
S1
S2
S3
S4
t
OFF
t
OFF
t
ON
t
ON
t
ON
t
ON
t
OFF
t
OFF
Fig. 93:
Colour change delay
Summary of Contents for PRO-LINE DE90
Page 108: ...9 Attachments FISCHER Mess und Regeltechnik GmbH 108 BA_EN_DE90 Fig 141 CE_DE_DE90_ATEX ...
Page 113: ...FISCHER Mess und Regeltechnik GmbH BA_EN_DE90 113 Notes ...
Page 114: ...FISCHER Mess und Regeltechnik GmbH 114 BA_EN_DE90 ...
Page 115: ...FISCHER Mess und Regeltechnik GmbH BA_EN_DE90 115 ...