Installation and assembly 

As standard, the device with the connecting port for 
connection  to  pipes  and  other  connection  parts, 
such as the welding sleeve, union nut with soldering 
and welding nipples, is equipped with soldering and 
welding  nipples  (see  data  sheet  MZ...).  It  can  be 
mounted  to a  wall  using  the  wall  bracket (see  data 
sheet MZ...). Manometer screw connections for 10, 
8,  6  mm  dia.  pipes  can  be  supplied  for  connection 
to pipes.The enclosure protection type IP 65 is only 
guaranteed,  if  a  suitable  power  supply  cable  is 
used.  

4.1 

Process connection 

• 

By authorized and qualified specialized person-
nel only. 

• 

Only  for  the  designated  mechanical  process 
connection  -  for  the  model,  see  the  order  code 
on the device type plate. 

• 

The  pipes  need  to  be  depressurized  when  the 
device is being connected. 

• 

Do not mount the device against existing water 
columns,  and  secure  suitably  against  pressure 
surges. 

• 

Use only with media suitable for operation. 

• 

Observe the maximum pressure. 

• 

Check  that  the  pressure  connections  do  not 
leak before commissioning. 

4.2 

Electrical connection 
 

• 

By authorized and qualified specialized person-
nel only. 

• 

Disconnect  the  system  from  the  mains  before 
connecting the device. 

• 

Do not take out the connecting plug while ener-
gized 

Explosion protection instructions 
 

To  guarantee  safe  operation  of  the  in-
strument,  the  supply  circuit  must  satisfy 
the requirements for zone  2, category  3, 
and  the  locally  applicable  regulations 

and  guidelines  for  the  installation  and  operation  of 
electrical  systems  in  explosion  hazard  areas  (e.g. 
EN 60079-0). 

The  supply  voltage  may  not  exceed  30  V  DC.  The 
supply circuit must be protected  by  a slow 200 mA 
fuse.  Only  a  CE-compliant  power  supply  unit  may 
be used as a power supply. 

4.3 

Wiring diagram 

Do  not  take  out  the  connecting  plug 
while energized 

 

 

Static electricity 

The case must be equipped with an 
earth connection to reduce the surface 
resistance. 

 

Commissioning 

• 

All  electrical  supply,  operating  and  measuring 
lines,  and  the  pressure  connections  must  have 
been  correctly  installed  before  commissioning. 
All  supply  lines  are  arranged  so  that  there  are 
no mechanical forces acting on the device. 

• 

If liquid measuring media are used the pressure 
connection  line  must  be  vented,  as  liquid  col-
umns of different heights in the pipes can cause 
measuring  errors. The  instrument must  be  pro-
tected  against  frost  if  water  is  used  as  a  medi-
um.  

• 

The pressure sensing lines must be installed on 
an  incline  so  that  no  condensation  pools  can 
form.  

• 

The  pressure  sensing  lines  need  to  be  kept  as 
short  as  possible  and  installed  without  sharp 
bends to avoid interfering delay times. 

• 

Appropriate  shutoff  valves  must  be  provided  to 
ensure  safety  during  installation,  maintenance 
and inspection 

Three-conductor circuit 

output  
Signal 

Operating 
voltage 

Summary of Contents for Me01 Series

Page 1: ...nd operation of this product Specialized personnel are persons who can assess the work they have been assigned and recognize potential dangers by virtue of their specialized train ing their skills and...

Page 2: ...e operating company s internal work operating and safety guidelines must be observed The operating company is responsible for ensuring that all required maintenance inspection and instal lation work i...

Page 3: ...afe operation of the in strument the supply circuit must satisfy the requirements for zone 2 category 3 and the locally applicable regulations and guidelines for the installation and operation of elec...

Page 4: ...nst impacts It may only be transported in packaging specifically intended for transport 8 Service All defective or faulty devices should be sent direct ly to our repair department We would ask you to...

Page 5: ...y Only CE compliant power supply units with a slow 200 mA fuse may be used Rated voltage 24V DC Allowed operating voltage Ub 15 30 V DC inner effective capacity Ci max 270nF effective inner inductivit...

Page 6: ...12 Dimensional drawings all dimensions in mm unless otherwise specified M16 x 1 5 Manometer connection port G1 2 nach DIN EN 837 SW22...

Page 7: ...urement accuracy Characteristic curve dev Relative pressure 1 0 M Characteristic curve dev Absolute pressure 1 0 S Discharge port Connection ports with external thread G B bottom Stainless steel 8 7 E...

Page 8: ...change without notice Changements techniques sous r serve Fischer Mess und Regeltechnik GmbH Bielefelder Str 37a D 32107 Bad Salzuflen Tel 49 5222 9740 Fax 49 5222 7170 eMail info fischermesstechnik...

Reviews: