
18
MMS
®
Inspection DPM High
5.2 Opening a batch
Before you start
•
The gage is switched on (
key
)
Opening an existing batch
1.
Main Menu (
)
> Batches > OK
2. Select the desired batch from the list:
3.
OK
4.
MEASURE >
OK
Measurement view for the selected batch opens.
What you can do next
•
Measure, see Page 19
Summary of Contents for 606-032
Page 12: ...8 MMS Inspection DPM High Description ...
Page 39: ......