![Fischer Panda Panda AGT 6000 Manual Download Page 36](http://html1.mh-extra.com/html/fischer-panda/panda-agt-6000/panda-agt-6000_manual_2294286036.webp)
Basics
Seite/Page 36 - Kaptitel/Chapter 4: Basics
9.12.14
4.4.3 Opening the GFK sound insulation capsule
Fig. 4.4-1: Lash closures
GFK sound insulation capsule with lash closures
Fig. 4.4-2: Lash closures
To open the lash closures pull the handle in arrow
direction and lift the lash of the closure pin. After lifting
of the lashes, the sound isolation cover upper pars can
be removed.
4.5
Special Service Instructions and Measures for Extended Machine
Downtimes and Decommissioning
Note:
The decommissioning and storage must be undertaken and
proved regarding the operation and storage situation.
Fischer Panda takes no responsibilty for damages
through wrong decommissioning and storage.
Downtimes are categorised in the following groups:
• Short downtime (1 to 3 months)
• Medium term downtime / hibernation (3 to 6 months)
• Extended downtime / decommissioning (more than 6 months)