Seite/Page 38 Grundlagen_deu.R01 - Kapitel/Chapter 3:
10.5.11
• Connect battery. Close battery main switch.
• Hold stop lever on generator motor in neutral position and crank starter for approx. 10 seconds. Then, pause for 10
seconds. Repeat this procedure 2 times.
• Perform visual check of the generator similar to initial commissioning and start up generator.
Note:
Fischer Panda recommends:
After extended downtimes, a full 150 h inspection as per the
inspection list should be performed.
3.4