![Fischer Panda 15000i PMS Manual Download Page 30](http://html1.mh-extra.com/html/fischer-panda/15000i-pms/15000i-pms_manual_2294291030.webp)
Basics
Seite/Page 30 - Kaptitel/Chapter 3: Basics
4.5.16
3.6
Transport and loading/unloading
3.6.1 Transporting the generator
• The generator must always be upright for transport.
• For transport, the Fischer Panda transport box shall be used for the generator. The generator shall be securely
attached to the bottom of the box.
• For loading/unloading, an adequate industrial truck shall be used.
• Depending on the transport distance (e.g. air cargo), the generator fluids (coolant, engine oil, fuel) may have to be
drained. The corresponding instructions and warnings must be fitted to the transport packaging.
3.6.2 Loading/unloading of the generator
For loading/unloading the generator, appropriate ring eye bolts shall be installed in the holes in the support rails. The
load bearing capacity of each ring eye bolt must at least equal the generator weight.
Fig. 3.6.2-1: Lifting yoke (example)
An adequate lifting yoke shall be used for transport/
loading.
3.7
Special service instructions and measures for extended machine
downtimes and decommissioning
Note:
The decommissioning and storage must be undertaken and
proved regarding the operation and storage situation.
Fischer Panda takes no responsibilty for damages
through wrong decommissioning and storage.
Downtimes are categorised in the following groups:
• Short downtime (1 to 3 months)
• Medium term downtime / hibernation (3 to 6 months)
• Extended downtime / decommissioning (more than 6 months)
Summary of Contents for 15000i PMS
Page 10: ...Seite Page 10 Kapitel Chapter 2 4 5 16 Leere Seite Intentionally blank...
Page 70: ...Installation Instructions Seite Page 70 Kaptitel Chapter 5 Installation Instructions 4 5 16...
Page 112: ...Tables Seite Page 112 Kaptitel Chapter 9 Tables 4 5 16...
Page 176: ...Seite Page 176 Kapitel Chapter 16 Annex 4 5 16 Leere Seite Intentionally blank Annex...