FIRST TEAM SPORTS, INC
Slam Series Assembly Instructions
Bill of Materials
A (1) Vertical Post
H (1) Pin Adjustment Bracket
O (8)
½
" Nylon Flatwasher
B (2) Short Extension Arm
I (1)
½
" x 8" Adjustment Pin
P (2) Lift Spring
C (2) Long Extension Arm
J (5)
½
" x 11" Hex Bolt
Q (4) 5/16"x 1" Machine Screw
D (1) Extension Arm Support
K (5)
½
" Locknut
R (4) 5/16" Flatwasher
E (1) I-Frame B-board Mounting
L (3)
½
" x 4" U-Bolt
S (4) 5/16" Lockwasher
F (1) 4" Square Post Cap
M (6)
½
" Lockwasher
T(4) 5/16" Hex Nut
G (1) Adjustment Handle
N (6)
½
" Hex Nut
NOTE: Immediately unpack all components and cross check against bill of materials. Report
any shortages to First Team customer service at 1-888-884-6677.