![First Light PLB Series Install Instructions Download Page 1](http://html1.mh-extra.com/html/first-light/plb-series/plb-series_install-instructions_2293802001.webp)
PRIOR TO INSTALL
Ensure install location receives at least 2 to 3 hours of midday
sun on average. Please handle bollard with care as scratches
will affect appearance and powder coat durability.
TOOLS REQUIRED
• 5/32 inch hex key
• 3/4 inch wrench or deep socket
Path
First Light Technologies
Document 70-0003 27 April 2021
© Copyright First Light Technologies
www.firstlighttechnologies.com
info@firstlighttechnologies.com
Toll Free: 1 (844) 279-8754
HEAD
POST
BASEPLATE
PLB MODELS
Please refer to the diagram below to identify the model you are
installing. This is needed for step 4.
INSTALL INSTRUCTIONS
PLB Series Solar Bollard
1. INSTALL ANCHOR BOLTS
With a one to two foot setback from the path or area to be illuminated, install concrete footing with
supplied anchor bolts. Align anchor bolts to path as shown below using the supplied cardboard
template to hold the bolts in position.
Footing
Anchor Bolts
Path
Footing
PLB ASYMMETRICAL
(PLB ASM)
PLB SYMMETRICAL
(PLB SYM)