First Light PLB Series Install Instructions Download Page 1

PRIOR TO INSTALL 

Ensure install location receives at least 2 to 3 hours of midday 

sun on average. Please handle bollard with care as scratches 

will affect appearance and powder coat durability.

TOOLS REQUIRED

•  5/32 inch hex key
•  3/4 inch wrench or deep socket

Path

First Light Technologies 
Document 70-0003  27 April 2021 
© Copyright First Light Technologies

www.firstlighttechnologies.com

info@firstlighttechnologies.com 

Toll Free: 1 (844) 279-8754

HEAD

POST

BASEPLATE

PLB MODELS

Please refer to the diagram below to identify the model you are 

installing. This is needed for step 4.

INSTALL INSTRUCTIONS

PLB Series Solar Bollard

1. INSTALL ANCHOR BOLTS

With a one to two foot setback from the path or area to be illuminated, install concrete footing with 

supplied anchor bolts. Align anchor bolts to path as shown below using the supplied cardboard 

template to hold the bolts in position.

Footing

Anchor Bolts

Path

Footing

PLB ASYMMETRICAL

(PLB ASM)

PLB SYMMETRICAL

(PLB SYM)

Reviews: