•
5/32” hex bit
•
9/16” socket
•
Torque wrench
•
Electrical Fishtape
1.
PLACE SOLAR ENGINE ON POLE
Ensure to completely insert tenon into the solar
engine.
2.
OPEN SOLAR ENGINE
Press the blue button on the side to unlock.
Once
opened, prop stick will automatically engage to
keep lid
open.
3.
AIM AND SECURE SOLAR ENGINE
Rotate
s
olar
e
ngine such that the green arrow points
south.
Use 5/32” bit to torque the 4x set screws to 86
in-lb.
4.
PLACE FIXTURE ON ARM AND OPEN FIXTURE
Press
the button on the underside of the fixture to
unlock.
Solar
E
ngine
Push
T
o
U
nlock
Tenon
Point
G
reen
A
rrow
S
outh
Tighten
S
et-
S
crews
Fixture
Push
T
o
U
nlock
Arm
PRIOR TO INSTALL
The BFL is designed to be installed on either a pole laying on
the ground, or on top of an erected pole.
Ensure install location
averages
2 to 3 hours of direct midday sun exposure for best
performance. Please handle fixture and solar engine with care
as scratches will affect appearance and powder coat durability
.
TOOLS REQUIRED
INSTALL INSTRUCTIONS
BFL-S SERIES STREET LIGHT
First Light Technologies
Document
70-0058 |
26
March 2020
© First Light Technologies Ltd.
1
www.firstlighttechnologies.com
Toll Free 1-844-279-8754