Integrated VFD/LCM Installation
1. Un-fasten 1xM3 screw
Remove the VFD Plastic
cover and Back Cover
on the terminal
2. Install the integrated
type of Customer
Display into the proper
area with the com port
internal cable
connected. And fasten
back 3 x M3 screws.
3. Integrated Customer Display Module connected to the, 5mm LCM Module (AP-2025)
is 5V; 9mm VFD (AP-2029), 9mm LCM 20x2 (AP-2024), LCM 240x64 (AP-240G) is
12V.
4. Do not exceed the tilt angle as this may
damage internal cable