Fire-Lite CHG-120F Installation & Operating Manual Download Page 1

Battery Charger

CHG-120F

Installation & Operating Manual

Document 50888
03/21/2001          Rev:

B

PN 50888:B0          ECN 01-155

Summary of Contents for CHG-120F

Page 1: ...Battery Charger CHG 120F Installation Operating Manual Document 50888 03 21 2001 Rev B PN 50888 B0 ECN 01 155...

Page 2: ...plosions caused by escaping gas improper storage of flammable materials etc Heat detectors do not sense particles of combustion and alarm only when heat on their sensors increases at a prede termined...

Page 3: ...anticipated or encountered Disconnect AC power and batteries prior to removing or in serting circuit boards Failure to do so can damage circuits Remove all electronic assemblies prior to any drilling...

Page 4: ...4 CHG 120F Instruction 03 21 01 PN 50888 B0 This Page Intentionally Left Blank...

Page 5: ...s 13 Mounting the Charger 14 Mounting the Charger into a CAB A3F or CAB B3F 14 Figure 7 Mounting a Charger in a CAB A3F or CAB B3F 14 Mounting the Charger in a BB 55F Battery Box 15 Figure 8 Mounting...

Page 6: ...re 16 Mounting an AM 1 or VM 1 to a BB 55F Battery Box 22 Installing a VM 1 23 Installing an MPM 3 23 Figure 17 Mounting an MPM 3 23 3 Operating the Charger 25 Overview 25 Starting the Charger 25 Unde...

Page 7: ...can configure the charger to disable the charger s ground fault detection to delay AC loss reporting 8 or 16 hours and to operate with 120 VAC or 240 VAC How long does it take the charger to charge b...

Page 8: ...rload and reverse polarity protection Replace a blown fuse with a fuse with the same rating and type Periodic Inspection Periodically inspect the batteries for corrosion and make sure that corrosive e...

Page 9: ...nnections Jumpers and Switches Location and references to connections jumpers and switches used to configure maintain and operate the charger 10 Connecting AC Power to the Charger How to connect AC po...

Page 10: ...tatus Indicators Nine LEDs to indicate status of the charger see Understanding the LED Status Indicators on page 25 Resistor R100 Used with JP8 to delay loss of AC reporting refer to Delay loss of AC...

Page 11: ...urce Figure 4 Connecting AC Power to the Charger SW1 set to 120 VAC operation SW1 set to 240 VAC operation Note The charger is rated for 120 VAC or 240 VAC operation Therefore 115V on SW1 indicates 12...

Page 12: ...teries Table 3 contains instructions for connecting batteries to the charger Warning Do not connect the Battery Interconnect Cable at this time Refer to Starting the Charger on page 25 TB2 Step Action...

Page 13: ...he Charger on page 25 TB2 Step Action 1 Remove all power sources to the charger 2 Tie the batteries in pairs by connecting the battery negative terminals and the battery positive terminals as shown in...

Page 14: ...r left corner Figure 7 position 2 Figure 7 shows the two mounting positions of a charger in a CAB A3F or CAB B3F Figure 7 Mounting a Charger in a CAB A3F or CAB B3F To mount a charger in a CAB A3F or...

Page 15: ...ries in the BB 55F Figure 8 illustrates the mounting position of a charger in a BB 55F Figure 8 Mounting a Charger in a BB 55F To mount a charger in a BB 55F battery box follow these instructions Step...

Page 16: ...ly auxiliary power supply and so forth as illustrated in Figure 9 Figure 9 Typical Wiring of a Charger to a Multiple Load To connect a charger as shown in Figure 9 follow these steps Step Action 1 Con...

Page 17: ...attery charger no JP1 jumper System damage will result To connect a charger as shown in Figure 10 follow these steps Step Action 1 Cut jumper JP1 on the MS 9200 main circuit board 71741 available June...

Page 18: ...s shown in Figure 11 Be certain to observe polarity 3 If needed connect the battery and battery terminals of an optional external device to the charger output circuit TB2 Out 2 and Out 2 as shown in F...

Page 19: ...other alarm devices as illustrated in Figure 12 Figure 12 Typical Connections for Drawing Additional Current To connect a charger as shown in Figure 12 follow these steps Step Action 1 Connect the Ba...

Page 20: ...of the trouble bus and Form C trouble contacts when AC fails You can configure the charger for an 8 hour or a 16 hour delay as follows 8 hour delay Cut and remove jumper JP8 on the charger Figure 13...

Page 21: ...connections Figure 15 Connections for Optional Devices Function Connector Use open collector input and output to daisy chain a trouble signal through the charger without affecting charger operation J...

Page 22: ...harger Figure 15 2 Mount the AM 1 into a mounting slot on the front of the BB 55F Figure 16 3 Connect the AM 1 harness to JP3 on the charger Figure 15 making sure to observe proper polarity Figure 16...

Page 23: ...1 into a mounting slot on the front of the BB 55F battery box 2 Connect the positive lead to TB2 Out 1 See Figure 15 3 Connect the negative lead to TB2 Out 1 SeeFigure 15 Installing an MPM 3 To insta...

Page 24: ...Installing the Charger Installing Optional Meters 24 CHG 120F Instruction 03 21 01 PN 50888 B0 Notes...

Page 25: ...C power to the charger The AC On LED and Trouble LED turn on 2 Connect the batteries to the charger 3 Connect the Battery Interconnect Cable The Trouble LED turns off 4 Connect the charger to the load...

Page 26: ...ies the HI and LO Charge LEDs switch on and off approximately every 20 seconds Also one of the 23 V 25 V 27 V or Low Battery LEDs also comes on depending on the battery voltage LED Normal Operation AC...

Page 27: ...ansportation prepaid to the manufacturer This writing constitutes the only warranty made by this manufacturer with respect to its products The manufacturer does not represent that its products will pr...

Page 28: ...World Headquarters One Fire Lite Place Northford CT 06472 1653 USA 203 484 7161 Fax 203 484 7118 www firelite com...

Reviews: