background image

71-0165 

Page 1 

4215-137 

Rev. 01 

 

09/07/2021 

 

 
 

 

NorthStar Outdoor Series Owner’s Manual 

 

NS 46, NS 56, NS 57 

with SL2 Control and CB 16-1 

and Bluetooth Sound Sytem (Optional) 

 
 

 
 

 
 

 

Precautions Before Use

 

2

 

Read Before Installation

 

2

 

Exterior Paint Requirements

 

Room Summary

 

Room Assembly

 

Roof Assembly 

10 

Electrical Installation

 

14 

Sound Bar Installation

 

18

 

Interior Installation

 

20

 

Control Operation

 

22

 

Maintenance and Troubleshooting 

24 

 

NS 46, NS 56 Room 
(4’ x 6’ , 5’ x 6’) 

NS 57 Room (5’ x 7’) 

Summary of Contents for NorthStar Series

Page 1: ...tooth Sound Sytem Optional Precautions Before Use 2 Read Before Installation 2 Exterior Paint Requirements 3 Room Summary 4 Room Assembly 5 Roof Assembly 10 Electrical Installation 14 Sound Bar Instal...

Page 2: ...mal body temperature of 98 6 F The symptoms of hyperthermia include an increase in the normal temperature of the body dizziness lethargy drowsiness and fainting The effects of the hyperthermia include...

Page 3: ...equires storm primer Variations of tones colors Sikkens Cetol Log and Siding Oil based Various Transparent Tip Paint Stain exterior cove trim prior to installation for ease in painting Photo above use...

Page 4: ...Roofing 40 Carriage Bolt Washer NS 57 Bench ONLY 2 Note Parts depicted in the diagram will differ between models Window Door Casing normally pre installed Inside Cove Molding Exterior Fascia Trim Eve...

Page 5: ...ight corner wall panel panel 1 on the outer edge of the corresponding floor panel 3 Place the front panel of the right wall panel 2 on the floor and butt it to the front panel Note The 4 x 6 and 5 x 6...

Page 6: ...her with a 3 screw where the panels meet on top Ensure tongue and groove are fully engaged 7 Install the next panel in the number series Secure the side wall to the back wall panel with three 3 Torq s...

Page 7: ...stall the next wall panel of the left wall Repeat step 6 between the wall panels 11 Install the door panel next to the right front wall panel Repeat step 6 between wall panels 12 Install the remaining...

Page 8: ...late ensure all panels are connected together on top and on the corners 15 Secure top plates using the 2 Torq screws Install one screw in each corner and one screw in the center of each wall 16 Instal...

Page 9: ...side walls between pencil marks on red sticker labeled Lower Bench Support Secure with 3 Torq screws in the provided predrilled holes 18 Install a 3 Torq screw into each access opening to secure the w...

Page 10: ...engaged in groove of roof panel 22 Secure roof panels together using a 3 Torq screw 23 Once roof panels are secured together to create one piece center the roof over the room The left overhang should...

Page 11: ...scia starting with the back edge The back trim should be cut so it is flush to the left and right side fascia Note Nail trim into ceiling so the flat edges are against the fascia 28 Install the front...

Page 12: ...f 2 to ensure moisture does not get under the paper Trim tar paper to be flush with the edges of the roof panels 35 Lay out the metal roofing sheets on a flat surface to determine the amount of overla...

Page 13: ...ecure left and right side flashing to fascia with three roofing screws 41 Install front flashing to the roof so there is of overhang on each side Secure on top with 4 roofing screws one 5 1 2 from eac...

Page 14: ...sauna heater 46 Lay the heater on its back and remove the two 8 screws that secure the bottom cover plate save screws for re installation 47 Install the strain relief clamp as shown about 2 5 from th...

Page 15: ...ections can cause heat damage to wires terminal blocks and other components and may void the warranty 51 Connect wires from building electrical supply to the lower terminal block labeled L1 L2 and Gnd...

Page 16: ...Insert the sensor and control cables into wire raceway one cable at a time and orientate them so they are on top of the large power cable and positioned towards the back of the raceway 59 When all th...

Page 17: ...ce one block horizontally on the floor and the other stacked vertically on top Install the wood heater guard around the sauna heater using the 1 1 8 screws provided 65 Temporarily connect the backrest...

Page 18: ...d Bar It is recommended that you mount the sound bar off the sauna floor Attach the wooden cleat as shown in Diagram B with the bevel facing up using the 2 Torx bit screws The best sound will be achie...

Page 19: ...the volume keys on your smart device to adjust volume on the SL2 Sound Bar All control functions are through your smart device and music App WARRANTY TyloHelo Inc will warranty the SL2 Sound Bar for...

Page 20: ...ndle with two screws provided within the handle package and cover screw heads with wooden buttons The NS 46 and NS 56 bench systems have two benches which span from left to right walls 76 Place upper...

Page 21: ...return bench to the notch on the upper main bench and the front wall bench support Use the 3 8 bit to drill 2 holes where the upper main and upper return benches meet Bolt the benches together using t...

Page 22: ...itself off and the control display will turn off SETTING THE TIME AND TEMPERATURE To set the sauna length time press the icon and then press the or icons to increase or decrease time for desired setti...

Page 23: ...emperatures before using the device in the Sauna IR Room USER MAINTENANCE INSTRUCTIONS WARNING The exterior of your NorthStar outdoor sauna requires prime paint or stain within a few days of installat...

Page 24: ...n PCA in CB box Pre Heat Means there is no sensor connected to the CB or the temperature is below 8 F Prior to calling please have the Model Type Number and Serial Number from room available If you ha...

Reviews: