background image

 

Page 3

DRAFT CONTROL INSTALLATION 

See Figure 4 for typical vent 
system layout. 

CAUTION:

 

This draft control is 

shipped as a single acting draft 
control. If the draft control is not 
being used on a gas draft induced 
furnace, remove the gate stop on 
the draft control ring before 
installing.

 

C

OLLAR 

I

NSTALLATION

 

This control is shipped with a collar 
patterned to fit a single wall round 
vent pipe. To attach this collar to 
the flue, see Figure 5 and follow 
the instructions below. 

1.  Bend outward the two ears at 

the front corners of the collar. 
Bend 90 degrees, 1/4 inch 
behind the single hole on the 
straps. 

2.  Insert clamping screw in ears on collar and bolt the remainder of 

the collar  together. 

3.  Hold the collar against the side of the flue in the exact position it 

is to be installed (shown by dotted lines) and  mark the outline 
of the collar on the  flue. 

4.  Cut a hole in the flue about 1/2"  inside of this outline. 

5.  Make a series of cuts about 1/2" apart from the edge of this hole 

to the  outline marks. 

6.  Strap the collar to the flue pipe. 

7.  Bend the tabs formed by the series of  cuts outward against the inside of the collar to make a tight joint. 

8.  Refer to Insertion of Draft Control Section. 

Figure 4

Figure 5

Summary of Contents for 46190700

Page 1: ...Kits can also control the operation of Field Draft Inducers and Combustion Air Systems ITEMS INCLUDED IN KIT 1 Junction box with mounted pressure switch and relay timer 1 1 Ft Length of 1 4 inch alumi...

Page 2: ...the CK 43 junction box or installer supplied junction box onto the wall or floor joist without straining the flexible conduit Fasten the CK 43 junction box through the four dimpled locations on the ba...

Page 3: ...at the front corners of the collar Bend 90 degrees 1 4 inch behind the single hole on the straps 2 Insert clamping screw in ears on collar and bolt the remainder of the collar together 3 Hold the coll...

Page 4: ...8 DO NOT move the weight attached directly to the gate this is used only for balancing at the factory ADJUSTING THE DRAFT CONTROL WITH 5 AF Vertical Flues Mounting The control is shipped for installa...

Page 5: ...to decrease post purge time To increase the operation time rotate the timer adjustment screw clockwise See Figure 11 Typical post purge time should be between 1 and 2 minutes WIRING CAUTION Disconnec...

Page 6: ...ter operating a Check pressure switch adjustment b Check wiring connections between pressure switch and burner c Check pressure switch for conti nuity across terminals during venter operation 2 Venter...

Page 7: ...INSTALLER S NAME _____________________________________________________ INSTALLER S COMPANY __________________________________________________ INSTALLER S PHONE NO ____________________________________...

Page 8: ...Page 8 P N 46190700 Rev C 09 01...

Reviews: