background image

24 VAC SYSTEM CONTROL KIT  

Model: 

CK-43

 

The CK-43 is designed for use with the SWG Series Power 
Venter for controlling Natural Gas and L.P. Gas Draft Induced 
appliances. 

Control kits control the operation of SWG Power Venters. Control 
Kits can also control the operation of Field Draft Inducers and 
Combustion Air Systems. 

I

TEMS INCLUDED IN 

K

IT

 

1)  Junction box with mounted pressure switch and 

relay/timer. 

1) 1 Ft. Length of 1/4 inch aluminum tubing. 
1) 1/4 inch tubing connector 
1) Flexible conduit connector 
1) 4" MG1 Barometric Draft Control or 5" AF Barometric 

Draft Control 

 
 
 

 

DO NOT DESTROY 

THESE INSTRUCTIONS MUST REMAIN WITH EQUIPMENT

  

 

 

 

 

Tubing 

MG1 Barometric 

Draft Control 

Summary of Contents for 46190700

Page 1: ...Kits can also control the operation of Field Draft Inducers and Combustion Air Systems ITEMS INCLUDED IN KIT 1 Junction box with mounted pressure switch and relay timer 1 1 Ft Length of 1 4 inch alumi...

Page 2: ...the CK 43 junction box or installer supplied junction box onto the wall or floor joist without straining the flexible conduit Fasten the CK 43 junction box through the four dimpled locations on the ba...

Page 3: ...at the front corners of the collar Bend 90 degrees 1 4 inch behind the single hole on the straps 2 Insert clamping screw in ears on collar and bolt the remainder of the collar together 3 Hold the coll...

Page 4: ...8 DO NOT move the weight attached directly to the gate this is used only for balancing at the factory ADJUSTING THE DRAFT CONTROL WITH 5 AF Vertical Flues Mounting The control is shipped for installa...

Page 5: ...to decrease post purge time To increase the operation time rotate the timer adjustment screw clockwise See Figure 11 Typical post purge time should be between 1 and 2 minutes WIRING CAUTION Disconnec...

Page 6: ...ter operating a Check pressure switch adjustment b Check wiring connections between pressure switch and burner c Check pressure switch for conti nuity across terminals during venter operation 2 Venter...

Page 7: ...INSTALLER S NAME _____________________________________________________ INSTALLER S COMPANY __________________________________________________ INSTALLER S PHONE NO ____________________________________...

Page 8: ...Page 8 P N 46190700 Rev C 09 01...

Reviews: