background image

 

SIDE WALL VENT HOOD  

Model:

 SWH-1-Four through Eight 

CAUTION:

 

Read instructions prior to installation

.

 

This device should be installed in accordance with the National Fuel Gas Code; A.N.S.I., 
Z223.1 (See Requirements Below) and any local codes which are applicable. All individual or 
multiple appliance vents must enter the vent system on the inlet side of the venter. 

1.  The exit terminals of mechanical draft systems shall be not less than 7 feet above grade 

when located adjacent to public walkways. 

2.  A venting system shall terminate at least 3 feet above any forced air inlet located within 

10 feet. 

3.  The venting system of other than a direct vent appliance shall terminate at least 4 feet 

below, 4 feet horizontally from or 1 foot above any door, window or gravity air inlet into 
any building. 

4.  The vent termination of a direct vent appliance with an input of 50,000 BTU per hour or 

less shall be located at least 9 inches from any opening through which vent gases could 
enter a building, and such an appliance with an input  over 50,000 BTU per hour shall 
require a 12-inch vent termination clearance. The bottom of the vent terminal and any air 
intake shall be located at least 12 inches above grade.  

5.  Power venter should be located as close as possible to the outside wall. Forced draft 

systems and all portions of induced draft systems under positive pressure during 
operation shall be designed and installed so as to prevent leakage of vent gases into 
building. 

6.  The vent termination point shall not be installed closer than 3 feet from an inside corner of 

an L-shaped structure, or not less than 12 inches above grade. 

7.  For proper ventilation and for reduction of combustion hazards, Class B type vent pipe is 

recommended for gas appliances and Class L type vent pipe for oil appliances. 

DO NOT DESTROY 

THESE INSTRUCTIONS MUST REMAIN WITH EQUIPMENT 

 

 

 

Reviews: