![FIBARO Switch 2 FGS-2 3 Series Operating Manual Download Page 6](http://html1.mh-extra.com/html/fibaro/switch-2-fgs-2-3-series/switch-2-fgs-2-3-series_operating-manual_2286575006.webp)
6
InSTAllATIOn
#3: Installation
Connecting the Switch 2 in a manner inconsistent with this
manual may cause risk to health, life or material damage.
When connecting the Switch 2 act in accordance with the
following rules:
• Connect only in accordance with one of the diagrams,
• Electrical installation must be protected by overcurrent protection
(fuse) of with a value not higher than 10A,
• The Switch 2 should be installed in a wall switch box compliant with
a relevant national safety standards and with depth no less than
60mm,
• Electrical switches used in installation should be compliant with the
relevant safety standards,
• length of wires used to connect the control switch should not
exceed 10m.
!
Notes for the diagrams
:
S1
- terminal for 1st switch (has the function of
activating the learning mode)
S2
- terminal for 2nd switch
L
- terminal for live lead
Q/Q1
- output terminal of the 1st channel
Q2
- output terminal of the 2nd channel (only
Double Switch 2)
N
- terminal for neutral lead
B
- service button (used to add/remove the de-
vice and navigate the menu)
B
Q
L
N
S1 S2 L
B
Q1
L
N
S1 S2
DOUBLE
SWITCH 2
FGS-223
Q2
SINGLE
SWITCH 2
FGS-213
Tips for arranging the antenna
:
• locate the antenna as far from metal elements as possible
(connecting wires, bracket rings, etc.) in order to prevent
interferences,
• Metal surfaces in the direct vicinity of the antenna (e.g. flush
mounted metal boxes, metal door frames) may impair signal
reception!
• Do not cut or shorten the antenna - its length is perfectly matched
to the band in which the system operates.
Summary of Contents for Switch 2 FGS-2 3 Series
Page 2: ......