Requirements
–
PC with FFT as well as control and motor controller are connected over the same network.
–
Participants (control, motor controller) are connected directly over a switch.
Port
Description
TCP/UDP
161
PROFINET (use of SNMP)
80, 8080
HTTP. Access to the servo press
software
TCP
20, 21
FTP
TCP
1024 - 65535
FTP logging
Depending on the FTP server
configuration, ports in this area
have to be released.
TCP
4444
Control of servo press via
TCP/IP
TCP
502
Modbus
TCP
44818
EtherNet/IP
TCP
2222
EtherNet/IP
UDP
10002
Festo Field Device Tool
UDP/TCP
445
SMB
TCP
4840, 443
OPC UA
TCP
Tab. 19 Ports for servo press controller
Preparation with the FFT
1. Preparation with the FFT: set network parameters of the controller CECC-X-M1-YS.
2. Set network parameters of the motor controller CMMP-AS.
3. Optional: update firmware and software.
–
Firmware update for controller CECC-X-M1-YS
–
Firmware update for motor controller CMMP-AS
–
Software update for servo press software on the controller CECC-X-M1-YS
Examples with explanations in the application notes from Festo
è
NOTICE!
Increased wear in case of operation with too little stroke.
•
Observe the minimum stroke.
•
If undercut: minimum stroke of 12.5 mm must be traversed 10 times in every 100 movement
cycles.
Commissioning
28
Festo — YJKP — 2019-01e