3. Installation
3−22
Festo P.BE−CPASC−EN en 0412b
Proceed as follows:
1. Identify all pneumatic tubing by marking.
2. Press down the locking ring of the screw connnector
1
e.g. with a screwdriver or with the Festo QSO release tool
or loosen the clamping screw
2
of the connector.
3. Pull the tubing out of the screw connector.
4. Seal non−required screw connections with blanking
plugs
3
.
1
2
3
Fig.3/9:
Disconnecting the tubing
3.5.3
Connecting the electric cables
Warnung
·
Use only PELV
circuits
as per IEC/DIN EN 60204−1 (Pro
tective Extra−Low Voltage, PELV) for the electrical supply.
Consider also the general requirements for PELV circuits
in accordance with IEC/DIN EN 60204−1.
·
Use power
supplies
which guarantee reliable electrical
isolation of the operating voltage as per IEC/DIN EN
60204−1.
Summary of Contents for Smart cubic CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0412b...
Page 16: ...Contents and general instructions XIV Festo P BE CPASC EN en 0412b...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0412b Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0412b Chapter 2...
Page 53: ...Installation 3 1 Festo P BE CPASC EN en 0412b Chapter 3...
Page 81: ...Commissioning 4 1 Festo P BE CPASC EN en 0412b Chapter 4...
Page 98: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0412b...
Page 99: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0412b Chapter 5...
Page 112: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0412b...
Page 113: ...Technical appendix A 1 Festo P BE CPASC EN en 0412b Appendix A...
Page 129: ...Index B 1 Festo P BE CPASC EN en 0412b Appendix B...
Page 130: ...B Index B 2 Festo P BE CPASC EN en 0412b Contents B Index B 1...
Page 136: ...B Index B 8 Festo P BE CPASC EN en 0412b W Weights A 4...