A. Technical appendix
A−6
Festo P.BE−CPV−DI02−EN en 0704NH
A.2
PROFIBUS−DP:
C
o
mm
i
ss
i
o
nin
g w
it
h
t
h
e
g
ene
r
a
l DP
mas
te
r
The Festo CPI system can be controlled from any PLC, PC or
industrial PC with a PROFIBUS−DP module in accordance with
EN50170.
Further information
Read the information on the following themes in the
appropriate sections:
Module consistency, FREEZE and SYNC, identifiers:
section 2.1.4
GSD: section 2.2
A.2.1
Bus start
In order to commission the CPI system correctly, the DP master
must carry out the following functions in the sequence specified:
1. send parametrizing data (Set_Prm)
2. check configuration data (Chk_Cfg)
3. transfer input and output data (cyclic data exchange,
Data_Exchange)
4. read diagnostic information (Slave_Diag).
The composition and contents of the individual telegrams are
described in the following sections.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...