3
EtherCAT with FHPP
Festo – EMCA-EC-C-HP-EN – 2017-11e – English
79
3.13
Commissioning with the Festo Configuration Tool (FCT)
The first time the EMCA enters service is via the Festo Configuration Tool (FCT)
è
FCT help for Plu
gIn EMCA.
Note
With activation of FCT in the device control, the Festo Configuration Tool (FCT) takes
over master control via the EMCA. EtherCAT communication to the controller remains
enabled via the EtherCAT interface [X2/X3] but EtherCAT has no master control.
Commissioning with the Festo Configuration Tool (FCT) via the Ethernet interface [X1]
should first be done without the EtherCAT network (ports [X2/X3] open).
Summary of Contents for EMCA-EC-67 CO Series
Page 33: ...2 CANopen Festo EMCA EC C HP EN 2017 11e English 33 ...
Page 73: ...3 EtherCAT with FHPP Festo EMCA EC C HP EN 2017 11e English 73 ...
Page 87: ...4 EtherNet IP with FHPP Festo EMCA EC C HP EN 2017 11e English 87 ...
Page 113: ...6 PROFINET IO with FHPP Festo EMCA EC C HP EN 2017 11e English 113 ...
Page 116: ...7 FHPP 116 Festo EMCA EC C HP EN 2017 11e English ...
Page 140: ...8 FHPP standard data I O data 140 Festo EMCA EC C HP EN 2017 11e English ...
Page 148: ...9 Measuring reference system 148 Festo EMCA EC C HP EN 2017 11e English ...
Page 210: ...10 Control via FHPP 210 Festo EMCA EC C HP EN 2017 11e English ...
Page 223: ...11 Monitoring of the drive behaviour Festo EMCA EC C HP EN 2017 11e English 223 ...
Page 367: ...D CANopen communication Festo EMCA EC C HP EN 2017 11e English 367 ...
Page 402: ...F Diagnostics and fault clearance 402 Festo EMCA EC C HP EN 2017 11e English ...
Page 413: ...EMCA EC 67 CO DIO EC EP PN Festo EMCA EC C HP EN 2017 11e English 413 ...
Page 414: ...EMCA EC 67 CO DIO EC EP PN 414 Festo EMCA EC C HP EN 2017 11e English ...
Page 415: ......