4.2 Preparing the CP system for commissioning
WARNING
Leave the fieldbus unconnected while you are com-
missioning the CP system.
You thereby avoid:
– addressing errors which arise due to modification of
the address ranges with various fieldbus systems
while they are operating.
Before commissioning a fieldbus system with CP node,
you should first prepare each individual CP system for
commissioning.
Preparations
Proceed as follows:
1. Check the pneumatic tubing of the CP valve termi-
nals with the aid of the manual override (see pneu-
matics manual).
2. Check the complete electrical circuitry of the CP
system.
3. Save the current string assignment of the CP sys-
tem as the nominal assignment, as described in the
following section.
4. Commissioning
4-4
CP... 9806A
Summary of Contents for Compact Performance System
Page 1: ...Compact Performance CP system Installation and commissioning...
Page 3: ...Part no 165 226 Title Manual Designation P BE CPSYS GB II CP 9806A...
Page 12: ...Chapter 1 System overview 1 System overview CP 9806A 1 1...
Page 33: ...1 System overview 1 22 CP 9806A...
Page 34: ...Chapter 2 Fitting 2 Fitting CP 9806A 2 1...
Page 46: ...Chapter 3 Installation 3 Installation CP 9806A 3 1...
Page 64: ...Chapter 4 Commissioning 4 Commissioning CP 9806A 4 1...
Page 82: ...Appendix A Technical appendix A Technical appendix CP 9806A A 1...
Page 91: ...V Voltage connecting 3 14 selecting the cable 3 16 A Technical appendix A 10 CP 9806A...