Revision History
0101-9030-0
Revision
Change Description
Reason/
Application
Date
Approved
A
First version of manual
Applied to all FC-4400
systems built between Oct.
2007 and June 2010
Nov. ‘07
LW
B
In sections 1.4 and 2.5, corrected
values for power drops to be
provided for vacuum system and e-
beam power supply.
Corrections provided by
Temescal Field Service
and Temescal Engineering.
June
2010
LW
C
Added Figure 2-3 and updated
Figure 3-2. Deleted former Figures
3-7, 3-9, and 3-11.
Corrections provided by
Temescal Engineering.
Eliminated former Simba 2
control console option.
Oct.
2010
LW
D
In sections 1.4 and 2.4, corrected
input power specifications for
vacuum system.
Updated information
provided by Temescal Field
Service.
March
2011
LW
© 2011 Ferrotec (USA) Corporation. All rights reserved.