background image

HAZE SIDEBOARD

ASSEMBLY MANUAL 

Summary of Contents for Haze Sideboard

Page 1: ...HAZE SIDEBOARD ASSEMBLY MANUAL ...

Page 2: ...BOX CONTENTS 2 x M5 10 mm screws 1 x hex key 3 mm 1 x cabinet 1 x shelf 1 x u formed stabiliser 1 x legs 2 x wall safety set M6 16 mm screws x 2 4 x M8 16 mm screws 1 x hex key 5 mm 2 x rubber pads 1 ...

Page 3: ...DER TO ASSEMBLE Min two people Spirit level Power drill Screwdriver Pencil 2 Warning NB Screws and rawlplugs are not inlcuded as different kinds of walls require different rawlplugs screws 2 x rawlplugs 2 x screws ...

Page 4: ...3 M8 16mm screws for all 4 corners Use 5 mm hex key ASSEMBLY PROCESS Please mount the cabinet to the legs using the screws indicated above 1 ...

Page 5: ...l safety set onto the sideboard and place it against the wall Screw the wall safety onto the cabinet Do not tighten screws yet 3 Remember to level the sideboard with the adjustable feet to avoid the sideboard becoming crooked If needed pre drill holes and insert rawlplugs Screw the wall safety into the wall Finally tighten the screws into the cabinet 4 ...

Page 6: ... formed stabiliser inside the cabinet so that it faces downwards Place it upon the pre drilled holes at the bottom of the cabinet then use the hex key to fasten the two screws from underneath 4 5 2 x M5 10mm screws Use 3 mm hex key ...

Page 7: ...ds on top of the u form to prevent friction between the parts Then place the metal shelf inside the cabinet and lower it down so that it ends up resting upon the u form as well as the support in the four corners 5 6 Add the two rubber pads ...

Page 8: ...fermliving com ...

Reviews: