background image

Feniex Industries, Inc.
1.800.615.8350
 /

 

feniex.com

5

 Mounting Option 1: Bezel 

1. Place the Down Lux Surface Mount 

between the bezel and rear gasket.
2. Place against the intended mounting 

surface and mark the holes for drilling.
3. Mark the areas where the mounting 

holes will be drilled. If the mounting surface 

is part of the vehicle, make sure no vital 

components could be damaged by the 

drilling process. There is an installation 

template available at feniex.com.
4. Drill the mounting holes in the marked 

surface. If wires need to pass through 

the vehicle, drill a 0.5” diameter hole for 

wire passage. Make sure to deburr holes 

thoroughly.
5. Pass the wires through the 0.5” diameter 

hole and secure the Surface Mount with 

bezel and gasket to the mounting surface 

using the factory provided screws (ensure no 

vital components are damaged when drilling 

holes for the surface mount).

 Mounting Option 2: No Bezel 

1. Place the large bolt (part #1) in the rear of 

the control, as shown in the diagram.
2. Secure the bolt by placing the bracket 

(part #2) over the bolt so the bracket is f lush 

with the gasket.
3. Secure the bracket and bolt to the rear 

of the gasket with the two factory provided 

screws (part #3). 
4. Mark the areas where the mounting 

holes will be drilled. If the mounting surface 

is part of the vehicle, make sure no vital 

components could be damaged by the 

drilling process.
5. Drill two mounting holes on the mounting 

surface, making sure no vital components of 

the surface are damaged. 
6. Using customer provided screws, secure 

the Down Lux to the mounting surface.

2A Fuse

MOUNTING

Mounting 

option 1

Mounting 

option 2

Reviews: