step 7
Cord management
• Ensure the workstation is raised to the highest position.
• Route the keyboard and mouse cords through the holes in the worksurface. (Image A)
• Route the monitor cords down the pole and clip with included cord clip. (Image B)
• Continue routing monitor cords down through the cord funnel at the rear of the platform. (Image C)
• Gather all cords underneath platform and route through the arm to the base.
• Ensure proper cord length for desired range of motion.
Image A
Image B
cord clip
worksurface
cord holes
Image C
Lotus
RT
Tension adjustment
Page 9