FELI TECHNOLOGY CO., LTD.
4
NTM-610 Manual Instructions 20221122
Single phase
220V
2-2 Main Power Installation
Connect the machine power cord
to no-fuse switch.
2-3 Main Power Operation
[Step 1]
First, make sure all the switches are
off. Then, push up the over-current
protection switch located on the
back of the roaster.
(This over-current protection device
is specific to
high current
.)
Push up the
over-current
protection switch
Main power port
Over-current safety
protection device
for high current