![Felder FD 21 professional User Manual Download Page 21](http://html1.mh-extra.com/html/felder/fd-21-professional/fd-21-professional_user-manual_549975021.webp)
21
!
$
#
"
!
"
$
#
Multi Boring Machine
FD 21 professional
1.
Lateral clamp support arms (on both sides)
Screw the outrigger arm using nuts and screws to the
machine stands.
2.
Attach all clamps to the lateral support.
—> 2x Standard
—> possibly one clamp additional as an accessory)
3.
Pre-assembled lateral support incl. compressor rods
attached using support arms
Affix with the clamping lever.
!
Lateral clamp support arms
"
Socket head cap screw
#
Pneumatic clamp frame
$
Workpiece clamp
Note: Some of the parts mentioned are only dismounted for overseas transport and might therefore already
be assembled.
5.3 Positioning and levelling the machine
Fig. 5-2: Positioning the machine
5.4 Assembly
1.
Transport the machine to the installation site as
instructed in the “Transport“ chapter and the enclo-
sed transport or installation instructions.
2.
Position the machine with the aid of a spirit level
to ensure that the machine functions precisely and
operates smoothly.
Even out uneven floors by setting the adjusting screw
or by bolstering the machine.
3.
If necessary, the machine can be bolted down to the
floor with the transport brackets.
4.
Remove the oxidation protective layer from all blank
machine parts.
!
Spirit levels
"
Adjusting screw
#
Steel platen
$
Transport brackets
5.4.1 Pneumatic clamp frame / Workpiece clamp
Fig. 5-3: Pneumatic clamp frame / Workpiece clamp
Setup and installation