Installation of the control system
ATTENTION: IMPORTANT INFORMATION FOR SAFE INSTALLATION.
OBSERVE ALL INSTRUCTIONS; WRONG INSTALLATION CAN RESULT IN SERIOUS INJURIES.
WARNING
During install of control system, system
must be disconnected from the mains.
Figure 1: Cover installation
Keypad connection
Min. 100mm
Min. 100mm
3x400VAC,
N, PE
50°C
-10°C
Figure 2: Installation of the control system
ATTENTION
•
Before installation, the control system must be
checked to make sure it does not show any
signs of transport or other damage. Damage
inside the control system can result in
significant consequential damages to the
control system and risk of injury to the user.
•
Touching the electronic parts, especially the
components of the processor circuit, is
forbidden.
Electronic components can be damaged or
destroyed by electrostatic discharge.
•
Before opening the casing cover, it must be
ensured there are no drill filings lying on the
cover which can fall inside the casing.
•
It must be ensured the system is disconnected
from the mains during installation.
•
Unused cable entries must be sealed using
suitable measures in order to guarantee the
protection class IP54 of the casing.
•
The cable entries must not be subjected to any
mechanical loads, especially tensile loads.
300
160
80
Ca. 130
0
Figure 3: Drilling plan