Alignments:
5 - Emitter Startup
6-9
5 - Emitter Startup
This procedure enables electron source switching On / Off.
In cases of emergency shut down or the microscope mains switch off
the Ion Getter Pumps (IGP) keep pumping the FEG source area
backed up by the Battery Supply Unit (BSU). However, the main IGP
power supply is switched off at this time so it is necessary to turn it on
when the mains power is recovered.
The BSU battery provides about nine hours of uninterrupted power
when fully charged and having full capacity. If the microscope was
without the power longer than nine hours, it is usually not possible to
start the IGP´s by this alignment procedure. It is necessary to call the
service to run the bake out procedure first.
Summary of Contents for Quanta FEG 250
Page 8: ...C vi...
Page 28: ...System Operation Quanta FEG System States 3 10...
Page 108: ...Alignments 1 Gun Alignment 6 6...
Page 114: ...Alignments 154 Water Bottle Venting 6 12 154 Water Bottle Venting...
Page 152: ...System Options Automatic Aperture System 9 4...
Page 154: ...System Options Nav Cam 9 6 401 NAV CAM AUTOBRIGHTNESS...
Page 177: ...System Options Cooling Stage Waterless Cooling Stage 9 29...