FEC Remote Lighting Controller V4 HP0832
User Installation and Operation Manual
© Interleader Ltd 2020
21 of 64
26/08/2020
6.3.1.2 Test Windsock & Beacon Relays
The windsock and beacon relays are tested in the same manner as the channel relays. Note that
the coil currents are not measured for these relays.
6.3.2 BMS Input and Output Tests
The BMS input and three BMS output relays can be tested.
Selecting input monitors the state of the input and displays it. Press F4 to exit.
Each of the 3 BMS relays can be tested by using F1-3 which toggles them on and off. Unlike the
power relays, these are small signal relays are inaudible in operation. Us a circuit tester across
their output contacts to test action. Schematics are shown in the Appendix.
Summary of Contents for HP0832
Page 64: ...End of Document...