Caution:
Wire devices in accordance
with the NEC.
If you are not sure about ex-
isting conductor wires, color
coding, polarity and circuit
feed contact a licensed
electrician.
Warning:
To be installed and/or used
in accordance with appro-
priate electrical codes and
regulations.
Warning:
To avoid fire, electrical
shock and/or electrocution
turn power OFF at the cir-
cuit breaker before wiring.
IMPORTANT: Please read carefully the following instructions before beginning.
1
OLD WORK
Unscrew the four screws at the
bottom of the box to remove
leveling feet.
2
3
Wire devices in accordance with the NEC.
Attach faceplates to mounting panels.
7
C12 - Installation Instructions
-
4
5
Once con-
crete has
cured, remove
temporary
cover. Locate
and pull wires.
Hand toweling near box edges is suggested once
concrete has been poured.
Attach conduits to the selected
knockouts.
Install temporary cover to pre-
vent debris from entering the
box during concrete pour. Duct
tape any cracks or seams
where concrete may enter.
Fix and secure box to the floor
using concrete mix.
Add concrete mixture below
and around box (if necessary)
to level the box in accordance
to the final floor level desired.
Install the desired floor covering material (ter-
razzo, tile, limestone,carpet, etc) on the floor.
6
Determine box location and
position in accordance to floor
plans.
Adjust the leveling screws until
the desired level is met.
FBS FLOOR BOX SYSTEMS
25060 Hancock Ave
STE 103-125
Murrieta, CA 92562
1-800-216-8307
Questions?
1.800.216.8307
www.FloorBoxSystems.com
Questions?
1.800.216.8307
www.FloorBoxSystems.com
Questions?
1.800.216.8307
www.FloorBoxSystems.com