![Fayat Dynapac DFP9 Operating Instruction, Maintenance Instruction Download Page 72](http://html1.mh-extra.com/html/fayat/dynapac-dfp9/dynapac-dfp9_operating-instruction-maintenance-instruction_546868072.webp)
8.4 Running-in instructions
8.4.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.4.2 After 25 operating hours
1.
Change the engine oil
Chapter 8.7.1 ‘Changing the engine
.
2.
Check engine and machine for leaks.
3.
Retighten the fastening screws on air filter, exhaust and other
attachments.
4.
Retighten the bolted connections on the machine.
5.
Checking the V-belt
Chapter 8.9.4 ‘Servicing the V-belt’
6.
Check the oil level in the vibrator housing.
Maintenance – Running-in instructions
DFP9
72
Summary of Contents for Dynapac DFP9
Page 6: ...Table of contents DFP9 6 ...
Page 7: ...1 Introduction Introduction DFP9 7 ...
Page 11: ...2 Technical data Technical data DFP9 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DFP9 15 ...
Page 39: ...4 Indicators and control elements Indicators and control elements DFP9 39 ...
Page 45: ...5 Checks prior to start up Checks prior to start up DFP9 45 ...
Page 52: ...Checks prior to start up Checking the water level topping up DFP9 52 ...
Page 53: ...6 Operation Operation DFP9 53 ...
Page 63: ...7 Loading transporting the machine Loading transporting the machine DFP9 63 ...
Page 67: ...8 Maintenance Maintenance DFP9 67 ...
Page 97: ...9 Troubleshooting Troubleshooting DFP9 97 ...
Page 103: ...10 Disposal Disposal DFP9 103 ...
Page 105: ......
Page 106: ......