![Fayat Dynapac DFP6 Operating Instruction Download Page 102](http://html1.mh-extra.com/html/fayat/dynapac-dfp6/dynapac-dfp6_operating-instruction_546884102.webp)
8.9.7 Measures for longer shut-down periods
8.9.7.1
Measures before shutting down
DANGER!
Danger to life caused by explosive gas-air
mixes!
–
Do not allow gasoline to come into contact with
hot components.
–
Smoking and open fire is prohibited.
–
Keep away from heat sources, sparks and
other sources of ignition.
–
Do not spill any gasoline.
If the machine is shut down for a longer period of time, e.g. winter
season, the following work must be carried out.
Depending on weather conditions these conservation measures
will protect the machine for approx. 6 to 12 months.
1.
Park the machine in secured condition
„Parking the machine in secured condition“ on page 67
.
2.
Allow the engine to cool down for at least 30 minutes.
3.
Clean the machine thoroughly.
4.
Change the engine oil
Chapter 8.7.1 „Changing the engine
5.
Use fuel stabilizer or drain off fuel completely.
1.
Mix fresh fuel with fuel stabilizer (follow the instructions of the
manufacturer).
2.
Empty the fuel tank and fill it with the prepared fuel mix.
3.
Start the engine and run the machine for approx. 10 minutes
in the open.
4.
Park the machine in secured condition.
1.
Close the fuel valve.
Using fuel stabilizer
Emptying the fuel tank.
Fig. 103
Maintenance – As required
DFP6
102
Summary of Contents for Dynapac DFP6
Page 2: ...2 ...
Page 6: ...Table of contents DFP6 6 ...
Page 7: ...1 Introduction Introduction DFP6 7 ...
Page 11: ...2 Technical data Technical data DFP6 11 ...
Page 16: ...Technical data Noise and vibration data DFP6 16 ...
Page 17: ...3 Concerning your safety Concerning your safety DFP6 17 ...
Page 39: ...Brief operating instructions Fig 14 Concerning your safety Signage DFP6 39 ...
Page 41: ...4 Indicators and control elements Indicators and control elements DFP6 41 ...
Page 48: ...Indicators and control elements Transport wheels DFP6 48 ...
Page 49: ...5 Checks prior to start up Checks prior to start up DFP6 49 ...
Page 57: ...6 Operation Operation DFP6 57 ...
Page 69: ...7 Loading transporting the machine Loading transporting the machine DFP6 69 ...
Page 74: ...Loading transporting the machine Transport wheels DFP6 74 ...
Page 75: ...8 Maintenance Maintenance DFP6 75 ...
Page 105: ...9 Troubleshooting Troubleshooting DFP6 105 ...
Page 111: ...10 Disposal Disposal DFP6 111 ...
Page 113: ...11 List of special tools List of special tools DFP6 113 ...
Page 115: ......
Page 116: ......