![Fayat BOMAG BW 120 AD-5 Operating Instruction Download Page 45](http://html1.mh-extra.com/html/fayat/bomag-bw-120-ad-5/bomag-bw-120-ad-5_operating-instruction_3685466045.webp)
Always keep a sufficient distance when
passing through subways, under bridges, tun-
nels, electric power lines etc.
3.7.2 Driving up and down slopes
Do not drive on gradients or slopes exceeding
the maximum gradeability of the machine
Chapter 2 ‘Technical data’ on page 13
Drive extremely carefully on gradients and
always directly up or down the slope.
Soil conditions and weather influences impair
the gradeability of the machine.
Wet and loose soil considerably reduces trac-
tion of the machine on inclinations and slopes.
Increased danger of accident!
3.7.3 Cross slope
The tipping angle was measured statically on
level, hard ground with the machine stopped
and without steering.
The max. permissible inclination of the
machine may be limited by the max. permis-
sible slanted position of the engine.
The specified angle must not be exceeded.
With loose soil, acceleration/deceleration, run-
ning vibration, steering or attached accessories
the tipping angle may be considerably lower.
Driving across slopes should therefore be
strictly avoided, because of the high risk of tip-
ping over and the related risk of severe or even
fatal accidents.
Fig. 9
Concerning your safety – Driving the machine; working operation
BW 120 AD-5
45
Summary of Contents for BOMAG BW 120 AD-5
Page 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Page 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Page 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Page 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Page 97: ...6 Operation Operation BW 120 AD 5 97 ...
Page 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Page 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Page 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Page 190: ...Maintenance As required BW 120 AD 5 190 ...
Page 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Page 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Page 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Page 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Page 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Page 209: ......
Page 210: ......