3.6 Starting up the machine
3.6.1 Prior to commissioning
Only use machines which have been serviced
at regular intervals.
Become acquainted with the equipment, the
indicators and control elements, the working
principle of the machine and the working area.
Use your personal protective equipment (hard
hat, safety boots, if necessary also goggles
and ear protection).
Make sure that the machine is equipped with
the required lighting according to the require-
ments of the application.
Do not take any loose objects with you or
fasten them to the machine.
Before mounting the machine check whether:
n
persons or obstructions are beside or under
the machine;
n
the machine is free of oily and combustible
materials;
n
all access steps, grips and platforms are free
of obstacles, grease, oils, fuel, dirt, snow
and ice;
n
all safety elements are in place;
n
all maintenance flaps and doors are closed
and locked.
Climb onto or off the machine only when the
machine is standing. Use the existing access
steps and grips.
When climbing on and off the machine use the
three-point support method: Always keep two
feet and one hand or one foot and two hands
on the machine.
Never jump off the machine.
Before commissioning, carry out all required
visual inspections and function tests.
Concerning your safety – Starting up the machine
BW 120 AD-5
41
Summary of Contents for BOMAG BW 120 AD-5
Page 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Page 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Page 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Page 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Page 97: ...6 Operation Operation BW 120 AD 5 97 ...
Page 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Page 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Page 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Page 190: ...Maintenance As required BW 120 AD 5 190 ...
Page 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Page 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Page 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Page 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Page 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Page 209: ......
Page 210: ......