![Fayat BOMAG BW 120 AD-5 Operating Instruction Download Page 187](http://html1.mh-extra.com/html/fayat/bomag-bw-120-ad-5/bomag-bw-120-ad-5_operating-instruction_3685466187.webp)
8.13.6 Measures prior to extended shut-down period
8.13.6.1 Measures before shutting down
If the machine is shut down for a longer period
of time, e.g. winter season, the following work
must be carried out:
1.
Clean the machine thoroughly.
2.
After shutting down store the machine
under cover in a dry and well ventilated
room.
3.
Grease the bare piston rods of all hydraulic
cylinders well and pull them in as far as
possible.
4.
Spray a thin oil film onto to all lever joints
and bearing points without lubrication.
5.
Repair damaged paint; preserve bare
areas thoroughly with anti-corrosive agent.
6.
Clean the water separator.
7.
Fill the fuel tank with diesel fuel to prevent
the formation of condensation water in the
tank.
8.
Change engine oil and oil filter if the oil has
been changed more than 300 hours ago, or
if the oil is older than 12 months.
9.
Check the anti-freeze concentration and
the coolant level.
10.
Disconnect the ground strap from the bat-
tery (this avoids self-discharge caused by
closed-circuit consuming devices).
Maintenance – As required
BW 120 AD-5
187
Summary of Contents for BOMAG BW 120 AD-5
Page 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Page 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Page 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Page 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Page 97: ...6 Operation Operation BW 120 AD 5 97 ...
Page 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Page 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Page 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Page 190: ...Maintenance As required BW 120 AD 5 190 ...
Page 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Page 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Page 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Page 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Page 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Page 209: ......
Page 210: ......