5.2 Tests before taking into operation
During the running in time the idle speed may increase
because of the enhanced moveability of the engine.
Idle speeds between 1850 and 2000 min
-1
.
The running in time of the vibratory tamper is 10 oper-
ating hours.
The following inspections must be carried out before each working
day or before a longer working period.
WARNING!
Danger of accident!
Please observe strictly the safety regulations in the
corresponding section of this instruction manual!
Park the machine on ground as level as possible.
Check:
condition of engine and machine
fuel tank and fuel lines for leaks
screw joints for tight fit
For a description of the following tasks refer to the
chapter "Daily maintenance".
Engine oil level, top up if necessary
Fuel level, top up if necessary.
Operation
BT 60 / BT 65
29
Go to
Discount-Equipment.com
to
order your parts