![Fayat BOMAG BPR 35/60 D Operating Instructions Manual Download Page 74](http://html1.mh-extra.com/html/fayat/bomag-bpr-35-60-d/bomag-bpr-35-60-d_operating-instructions-manual_546881074.webp)
1.
Disassemble the guard (2).
2.
Disassemble the V-belt pulley (1).
3.
Replace the V-belt.
4.
If necessary, reassemble the spacers that may have been
removed.
5.
Assemble the V-belt pulley, tightening torque: 35 Nm
(26 ft
·
lbf).
6.
Assemble the guard, tightening torque: 15 Nm (11 ft
·
lbf).
1.
Assemble the V-belt guard.
8.8.6 Checking, adjusting the valve clearance
NOTICE!
Danger of engine damage!
We recommend to have this work carried out by
trained personnel or our after sales service.
–
Before checking the valve clearance let the
engine cool down.
Protective equipment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
„Parking the machine in secured condition“ on page 51
.
2.
Let the engine to cool down to ambient temperature.
Replacing the V-belt
Fig. 65
Final work
Fig. 66
Preparations
Maintenance – Annually
BPR 35/60 D
77
Go to
Discount-Equipment.com
to
order your parts