D 31 35
Screed eccentric adjustment
To pave thicker layers of material, if the
piston rods in the levelling cylinder are
operating close to their limit position and
if the desired paving thickness cannot be
reached, it is possible to alter the ap-
proach angle of the screed by adjusting
the eccentric.
- Pos. I: Paving thickness
up to approx. 7 cm
- Pos. II Paving thickness
of approx. 7 cm
to approx. 14 cm
- Pos. III Paving thickness
above approx. 14 cm
- The spindle (1) is not adjusted.
- Unfasten locks (2) for eccentric adjustment.
- Swivel screed to the desired position using the lever (3), and engage the locking
knob again.
A
If the levelling unit is connected to a height controller, this has the function of balanc-
ing out any rapid rise in the screed position: The levelling cylinders are extended until
the correct height is reached.
- The change in approach angle can only take place slowly and uniformly on both
sides at once during paving operation, and involves the use of eccentric adjust-
ments. Failing this, any rapid response in the screed could easily cause waves to
appear on the road surface.
The setting process should therefore take place before work starts!
A
When equipped with rigid screed, the second hole (4) is intended for (item I).
3
2
III
II
I
1
4
Summary of Contents for DYNAPAC SC2500WS
Page 1: ...Operating Instructions Paver Finisher SD2500W SC2500WS Type 897 898 11 0419 4812074033...
Page 2: ...www dynapac com...
Page 14: ...12...
Page 28: ...A 2...
Page 37: ...B 9 4 Safety devices 4 5 6 7 10 7 9 3 2 5 11 7 13 1 12 8 14...
Page 51: ...B 23 71 70 40 41 42 xxxxxxxxxxxxxxxxx 9 73 12 12 13 9...
Page 94: ...C 13 28...
Page 98: ...D 13 4 10 13 16 15 17 11 12 9 8 7...
Page 100: ...D 13 6 10 13 16 15 17 11 12 9 8 7...
Page 102: ...D 13 8 10 13 16 15 17 11 12 9 8 7...
Page 104: ...D 13 10 18 19 20 21...
Page 106: ...D 13 12 22 23 24 25...
Page 108: ...D 13 14 26 27 28...
Page 110: ...D 13 16 29...
Page 112: ...D 13 18 33 32...
Page 114: ...D 13 20 35 34 36 37...
Page 116: ...D 13 22 38 40 41 39 42...
Page 118: ...D 13 24 38 40 41 39 42...
Page 120: ...D 13 26 38 40 41 39 42...
Page 122: ...D 13 28 44 43 45 46...
Page 124: ...D 13 30 48 52 50 47 51 49...
Page 126: ...D 13 32 48 52 50 47 51 49...
Page 128: ...D 13 34 48 52 50 47 51 49...
Page 130: ...D 13 36 54 58 56 53 57 55...
Page 132: ...D 13 38 54 58 56 53 57 55...
Page 134: ...D 13 40 54 58 56 53 57 55...
Page 136: ...D 13 42 60 59...
Page 138: ...D 13 44 64 61 62 66 65 63...
Page 140: ...D 13 46 64 61 62 66 65 63...
Page 142: ...D 13 48 68 67...
Page 144: ...D 13 50 70 69...
Page 146: ...D 13 52 72 71...
Page 148: ...D 13 54 74 73...
Page 150: ...D 13 56 76 75...
Page 152: ...D 13 58 78 77...
Page 154: ...D 13 60 3 Remote control...
Page 156: ...D 13 62 121 120 121...
Page 158: ...D 13 64 122 124 125 123 125 122 124...
Page 160: ...D 13 66 122 124 125 123 125 122 124...
Page 162: ...D 13 68 126 128 129 127 129 126 128...
Page 164: ...D 13 70 126 128 129 127 129 126 128...
Page 166: ...D 13 72 131 132 133 130...
Page 168: ...D 13 74 135 136 137 134...
Page 170: ...D 13 76 139 138...
Page 172: ...D 13 78 141 140 141...
Page 174: ...D 13 80 142 143...
Page 176: ...D 13 82 145 144 146 147 148...
Page 178: ...150 149 D 13 84...
Page 180: ...D 13 86...
Page 181: ...D 22 1 D 22 Operating the display...
Page 185: ...D 22 5 1 1 Menu operation procedure for adjusting parameters A B C...
Page 211: ...D 22 31 Service menu Password protected menu for various service settings...
Page 241: ...D 22 61 Example C...
Page 243: ...D 22 63 2 3 Error codes A Scan QR Code to access failure code chart...
Page 249: ...D 31 5 Control platform moveable o 6 2 5 7 4 8 3 9 10...
Page 253: ...D 31 9 Protective roof o A D B C B A C D 1 3 4 5 2...
Page 284: ...D 31 40 Illuminated balloon o 5 4 3 2 11 13 9 8 6 1 7 10 12...
Page 290: ...D 31 46...
Page 295: ...D 43 5 13 11 12 10 15 120...
Page 297: ...D 43 7 13 11 12 10 15 120...
Page 300: ...D 43 10 13 68...
Page 302: ...D 43 12 A B C...
Page 304: ...D 43 14 D 68 50 56 55 49...
Page 306: ...D 43 16 35 34 15 13 16 69 63 61 64 46 45 68 75 126 130...
Page 308: ...D 43 18 A 33 15 13 16 10...
Page 312: ...D 43 22 A B 59 67 37 36 54 48 53 47...
Page 314: ...D 43 24 15 13 73 70 54 48 53 47 71 72 123 127 126 130 126 130...
Page 318: ...D 43 28 13 15 74 73 70 69...
Page 321: ...D 43 31...
Page 322: ...D 43 32 13 15 74 73 70 69...
Page 324: ...D 43 34 13 15 11 12...
Page 326: ...D 43 36 13 11 15 69 75 12...
Page 346: ...E 13 14 Symbol Meaning Outer auger bearing Auger end bearing...
Page 363: ...E 13 31 Symbol Meaning RL Extension pipe left RR Extension pipe right RL RR...
Page 404: ...F 29 4...
Page 405: ...F 33 1 F 33 Maintenance conveyor 1 Maintenance conveyor...
Page 412: ...F 33 8...
Page 413: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly...
Page 425: ...F 41 1 F 41 Maintenance auger assembly 1 Maintenance auger assembly external drive version...
Page 482: ...F 55 34...
Page 519: ...F 61 1 F 61 Maintenance hydraulic system 1 Maintenance hydraulic system...
Page 536: ...F 61 18...
Page 537: ...F 72 1 F 72 Maintenance travel drive steering 1 Maintenance travel drive steering...
Page 548: ...F 72 12...
Page 549: ...F 83 1 F 83 Maintenance electrical system 1 Maintenance electrical system...
Page 559: ...F 83 11 Relays in the engine compartment K Function 0 Engine start...
Page 570: ...F 90 8...
Page 571: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping...
Page 585: ...F 115 3 2 1 6 5 7 4 3 6 8 9...
Page 592: ...F 115 10...
Page 593: ......
Page 594: ...www dynapac com...