![Fayat Group BOMAG BW 213 D-5 Operating Instruction, Maintenance Instruction Download Page 56](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707056.webp)
Wipe off spilled oil, collect leaking oil and dis-
pose of it in an environmentally friendly way.
Store used filters and other oil contaminated
materials in a separate, specially marked con-
tainer and dispose of them environmentally.
The settings for idle speed and highest speed
must not be changed, since this would affect
the exhaust gas values and cause damage to
engine and power train.
Engine and exhaust system work with high
temperatures. Keep combustible materials
away and do not touch any hot surfaces.
Check and change coolant only when the
engine is cold. Catch coolant and dispose of it
environmentally.
3.10.4 Maintenance work on electric components and battery
Before starting to work on electric parts of the
machine disconnect the battery and cover it
with insulating material.
Do not use fuses with higher ampere ratings
and do not bridge fuses.
When working on the battery, smoking or open
fire is prohibited!
Do not lay any tools or other metal objects on
the battery.
Do not wear jewellery (watch, bracelets, etc.)
when working on the battery.
The connection cables of the battery must not
touch or rub against machine parts.
3.10.5 Working on the air conditioning
Faults on the air conditioning should only be
remedied by authorized service personnel.
Concerning your safety – Maintenance work
BW 213 D-5
56
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......