![Fayat Group BOMAG BW 213 D-5 Operating Instruction, Maintenance Instruction Download Page 55](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707055.webp)
Do not step in front of or behind the machine
when performing adjustment work in the
hydraulic system.
Do not change the setting of pressure relief
valves.
Drain the hydraulic oil at operating temperature
– danger of scalding!
Any hydraulic oil must be collected and dis-
posed of in an environmentally friendly way.
Always collect and dispose of hydraulic oils
separately.
Do not start the engine after draining the
hydraulic oil. Once all work is completed (with
the system still depressurized!) check all con-
nections and fittings for leaks.
Hydraulic hoses must be visually inspected at
regular intervals.
Do not mix up hoses by mistake.
Only genuine BOMAG replacement hydraulic
hoses ensure that the correct hose type (pres-
sure range) is used at the right location.
3.10.3 Working on the engine
Do not work on the fuel system while the
engine is running - danger to life due to high
pressures!
Wait until the engine has stopped, then wait
another approx. 15 minutes.
Keep out of the danger zone during the initial
test run.
In case of leaks return to the workshop immedi-
ately.
Drain the engine oil at operating temperature –
danger of scalding!
Concerning your safety – Maintenance work
BW 213 D-5
55
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......