![Fayat Group BOMAG BW 213 D-5 Operating Instruction, Maintenance Instruction Download Page 52](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707052.webp)
3.9
What to do in events of emergency
3.9.1
Actuating the emergency stop switch
In events of emergency and in case of danger
actuate the emergency stop switch immedi-
ately.
The machine is braked immediately, the engine
is shut down.
Restart the machine only after the danger that
caused the actuation of the emergency stop
switch has been eliminated.
In case of frequent use the wear on the multi-
discs brakes will be very high, you shoudl
therefore never use the emergency stop as a
service brake.
3.9.2
Disconnect the battery
In events of emergency, e.g. in case of a cable
fire, disconnect the battery from the vehicle
network.
Pull out the main battery switch or lift off the
battery pole to do so.
3.9.3
Towing the machine
Tow the machine only in a case of emergency
or to avoid an accident.
Before releasing the parking brake apply suit-
able measures to secure the machine against
unintended rolling.
Use a towing vehicle with sufficient traction and
braking power for the unbraked towed load.
If no tow bar is used, towing is only permitted
uphill.
Concerning your safety – What to do in events of emergency
BW 213 D-5
52
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......