2.
Lift the tongue at point (1) and take the
printer ribbon (2) out of the printer.
3.
Insert the new printer ribbon into the
printer, then press in the tongue (1) on the
right.
4.
Tension the printer ribbon by turning the
rotary button (3) in direction of arrow.
5.
Close the cover.
8.11.8 Drain the fuel tank sludge
Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
Chapter 6.7 „Park the machine in
secured condition.“ on page 115
.
2.
Unscrew the drain plug and drain off and
catch approx. 5 litres of fuel.
3.
Turn the drain plug tightly back in.
4.
Dispose of fuel environmentally.
8.11.9 Measures prior to extended shutdown period
8.11.9.1 Measures before shutting down
If the machine is shut down for a longer period
of time (e.g. winter season), the following work
must be carried out:
1.
Clean the machine thoroughly.
2.
Clean the water separator.
3.
Fill the fuel tank with diesel fuel, to prevent
the formation of condensation water in the
tank.
Fig. 178
Fig. 179
Maintenance – As required
BW 213 D-5
203
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......