![Fayat Group BOMAG BW 213 D-5 Operating Instruction, Maintenance Instruction Download Page 179](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707179.webp)
8.9
Every 1000 operating hours
8.9.1
Replacing the V-belt
Protective equip-
ment:
n
Working clothes
n
Protective gloves
Perform this maintenance work at
the latest after two years.
1.
Park the machine in secured condition
Chapter 6.7 „Park the machine in
secured condition.“ on page 115
.
2.
Allow the engine to cool down.
3.
Slightly loosen the fastening screws of the
belt tensioning device.
4.
Slacken the tensioning device, so that the
V-belt can be taken off.
5.
Take the V-belt off.
6.
Slightly loosen the fastening screws (1, 2)
on the air conditioning compressor
mounting bracket.
7.
Loosen the tensioning nuts (3) and relieve
the V-belt by the tensioning device (4), until
the V-belt can be removed.
8.
Take the V-belt off.
Fig. 139
Fig. 140
Maintenance – Every 1000 operating hours
BW 213 D-5
179
Summary of Contents for BOMAG BW 213 D-5
Page 2: ...2...
Page 9: ...1 Introduction Introduction BW 213 D 5 9...
Page 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Page 15: ...2 Technical data Technical data BW 213 D 5 15...
Page 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Page 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Page 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Page 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Page 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Page 95: ...6 Operation Operation BW 213 D 5 95...
Page 124: ...Operation Emergency procedures BW 213 D 5 124...
Page 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Page 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Page 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Page 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Page 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Page 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Page 221: ......
Page 222: ......