![Fayat Group BOMAG BRP 35/60 D Operating Instruction, Maintenance Instruction Download Page 84](http://html1.mh-extra.com/html/fayat-group/bomag-brp-35-60-d/bomag-brp-35-60-d_operating-instruction-maintenance-instruction_546916084.webp)
3.
Assemble covering (1) and air filter cover (2).
4.
After a short test run check the valve cover for leaks.
8.9.7 Replacing the starter rope
Protective equipment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
‘Parking the machine in secured condition’ on page 55
2.
Allow the engine to cool down.
3.
Unscrew the fastening screws (1) and disassemble the recoil
starter (2).
4.
Pull the starter rope with the starter handle (1) out com-
pletely.
5.
Secure the coil (2) against winding up.
6.
Loosen the knot (3) in the starter rope and remove the old
starter rope.
7.
Carefully turn the coil back, until the recoil spring is relieved.
Fig. 82
Fig. 83
Fig. 84
Maintenance – Annually
BPR 35/60 D
86
Go
to
Discount-Equipment.com
to
your
parts