![Fayat Group BOMAG BP 12/40 Operating Instructions Manual Download Page 32](http://html1.mh-extra.com/html/fayat-group/bomag-bp-12-40/bomag-bp-12-40_operating-instructions-manual_3696886032.webp)
Maintenance
BOMAG
34
BP 12/40, BP 20/50, BP 25/50
5.5
Maintenance chart
With all maintenance intervals perform also
the work for shorter preceding service inter-
vals.
No.
Maintenance work
Remark
every
d
a
y
weekl
y
every
m
o
n
th
every
s
ix
m
o
n
th
every
year
as
req
u
ir
ed
5.6
Clean the machine
X
5.7
Check the engine oil level
Dipstick mark
X
5.8
Check the fuel level
X
5.9
Fill the water tank
X
5.10
Clean air filter
in case of extreme
dust clean every
day
X
5.11
Clean the cooling fins and the cooling
air intake openings
X
5.12
Engine oil change
at least every 250
operating hours
X
5.13
Check, clean the spark plug
X
5.14
Clean the fuel sludge filter
X
5.15
Clean the fuel screen
X
5.16
Check the V-belt, tighten, replace if nec-
essary
X
5.17
Check the rubber buffers
X
5.18
Check the oil level in the vibrator hous-
ing
X
5.19
Check, adjust the valve clearance
X
5.20
Change the oil in the vibrator housing
at least every 500
operating hours
X
5.21
Change the dry air filter
at least every year
X
5.22
Retighten bolted connections
X
5.23
Engine conservation
X
Go
to
Discount-Equipment.com
to
order
your
parts