![Fayat Group BOMAG BP 12/40 Operating Instructions Manual Download Page 31](http://html1.mh-extra.com/html/fayat-group/bomag-bp-12-40/bomag-bp-12-40_operating-instructions-manual_3696886031.webp)
Maintenance
BOMAG
33
BP 12/40, BP 20/50, BP 25/50
5.4
Running-in instructions
The following maintenance work must be per-
formed when running in new machines or
overhauled engines:
!
Caution
During the running-in period, up to approx. 200
operating hours, check the engine oil level
twice every day.
Depending on the load the engine is subjected
to, the oil consumption will drop to the normal
level after approx. 100 to 200 operating hours.
After 25 operating hours
l
Change the engine oil.
l
Check engine and machine for leaks.
l
Check the valve clearance, adjust if necessary
l
Retighten the fastening screws on air filter ex-
haust, fuel tank and other attachments.
l
Retighten the bolted connections on the ma-
chine.
l
Check the vibration drive V-belts.
Go
to
Discount-Equipment.com
to
order
your
parts