-54-
7.4 Operating
7.4.1 Connecting
•
Main power connecting
: Connect AC power to CN1 accoring to the input power
Single-phase 200-240 Three-phase 200-240V
Regenerative resistor
Sensor connector (6Pins)
Connect to CN3
Motor connector (4Pins)
Connect to CN2
Main power connect to CN1
Protective earth terminal
Be sure to ground
Lead wire stripping (8mm)
Insert lead wire to connector and fixing with driver
Summary of Contents for Ezi-SPEED ESD-30-C
Page 1: ......
Page 9: ...9 2 Characteristics 2 1 Part number...
Page 15: ...15 3 2 Dimensions 30W 60W 120W Drive 200W 400W Drive...
Page 18: ...18 ESM 90 H 120 ESM 104 H 200 ESM 104 H 400...
Page 19: ...19 4 3 Characteristics of motor torque 30W 60W 120W...
Page 20: ...20 200W 400W...
Page 63: ...63 8 2 Setting and 7 segments display 1 Monitor mode...
Page 64: ...64 2 Input Output setting mode...
Page 65: ...65 3 Parameter setting mode 1page...
Page 66: ...66 3 Parameter setting mode 2page...
Page 67: ...67 3 Parameter setting mode 3page...
Page 68: ...68 3 Parameter setting mode 4page...
Page 69: ...69 4 NVM saving mode...