background image

 

 

FAST FORWARD AG  |  Mansfelder Str. 56  |  D - 06108 Halle (Saale) 

Page 

/ 2 

 

FAST EnergyCam 2.0 Open Wire

 

Quick Start Guide 

1 -  How it works 

EnergyCam Open Wire reads mechanical gas meters and transmits meter reading data via Modbus. 

This guide gives you all the information you need to set up and run the device.  

 

2 -  

What’s in the box 

 

1) EnergyCam 2.0, wired type (Art. Nr. 1203)

2) EC2 Interface cable (Art. Nr. 1268) 

3) 3M adhesive pad  

4) 3M VHB surface cleaning kit 

5) Quick Start Guide (this document) 

 

 

 

 

 

3 -  Installation  

 

How to install your EnergyCam Open wire:

 

 

1

 

Raspberry PI implementation review  

Example implementation which compiles a CSV file from an application and presents it on a 
webserver: 

https://github.com/ffcrg/ecpi

 

 

2

 

Protocol documentation review

Download the latest Modbus documentation from our website: 

http://www.fastforward.ag/eng/download

 

 
 
 

Reviews: